This gravel calculator works out how much gravel you need for a driveway, patio base, path or drainage trench. Enter the area’s length, width and depth, pick the type of stone, and you get the volume in cubic yards, the weight in tons, the number of bags, and an estimated cost. You can mix feet, yards, meters, inches and centimeters freely.

How to use the gravel calculator

  1. Measure the length and width of the area and choose the unit for each.
  2. Enter the depth of the gravel layer (usually in inches).
  3. Select the gravel type. Each stone has a different density, which changes the tonnage.
  4. Keep about 10% extra for compaction and spillage (use 15–20% for a compacted road base).
  5. Optionally enter the price per ton from your supplier to see the total cost.

How is gravel calculated?

Volume (ft³)  = Length (ft) × Width (ft) × Depth (ft) × (1 + extra %)
Cubic yards   = Volume (ft³) ÷ 27
Tons          = Cubic yards × density (tons per yd³)
Cost          = Tons × price per ton

Depth is the step people most often get wrong: 3 inches is 3 ÷ 12 = 0.25 ft, not 3 ft. The calculator converts every unit for you. For a round area (a fire pit or tree ring), use the square footage calculator to get the area first, then enter it here as length = area and width = 1.

Example: gravel for a 20 × 10 ft patio base

You want a 3-inch layer of #57 crushed stone under a 20 ft × 10 ft patio:

  • Volume = 20 × 10 × 0.25 = 50 ft³
  • Add 10% → 55 ft³ ÷ 27 = 2.04 cubic yards
  • Weight = 2.04 × 1.4 = 2.85 tons
  • At $40 per ton the stone costs about $114 before delivery
  • In 0.5 ft³ bags you would need 110 bags — bulk delivery is far cheaper at this size

How much area does a ton or a yard of gravel cover?

Coverage for crushed stone at about 1.4 tons per cubic yard. Lighter stone such as lava rock covers far more area per ton.

Depth 1 cubic yard covers 1 ton covers
2 in 162 ft² 116 ft²
3 in 108 ft² 77 ft²
4 in 81 ft² 58 ft²
6 in 54 ft² 39 ft²
8 in 41 ft² 29 ft²
12 in 27 ft² 19 ft²

Recommended gravel depth by project

Project Typical depth Common stone
Garden path / walkway 2–3 in Pea gravel, decomposed granite
Patio or paver base 4–6 in Crusher run, #57 stone
Shed base 4–6 in Crushed stone #57
Driveway (new build) 8–12 in in layers Large base stone, then #57, then top stone
Driveway top-up 2–3 in Crushed stone, crusher run
French drain / trench Fill the trench Washed #57 or river rock
Decorative landscaping 2–3 in River rock, lava rock

Tips before you order gravel

  • Bulk vs bags: bags make sense below roughly half a cubic yard. Above that, bulk delivery by the ton or yard is usually several times cheaper.
  • Compaction: crusher run and road base compact by 15–20%, so order extra when the layer will be tamped or rolled.
  • Layering a driveway: build it in 4-inch lifts and compact each one. Calculate each layer separately because the stone and density differ.
  • Use landscape fabric under decorative gravel to slow weeds and stop the stone sinking into soil.
  • Ask for the supplier’s density. Moisture and stone size change the weight per yard; the presets here are typical averages.

Related calculators

Frequently Asked Questions

How do I calculate how much gravel I need?

Multiply length × width × depth in feet to get cubic feet, divide by 27 for cubic yards, then multiply by the stone density (about 1.4 tons per cubic yard for crushed stone) to get tons. Add about 10% for compaction.

How many tons of gravel are in a cubic yard?

Most gravel weighs 1.3 to 1.5 tons per cubic yard. Crushed stone is about 1.4 tons, pea gravel about 1.35 tons and crusher run about 1.5 tons. Lava rock is much lighter at around 0.5 tons.

How much area does one ton of gravel cover?

One ton of crushed stone covers about 116 square feet at 2 inches deep, 77 square feet at 3 inches and 58 square feet at 4 inches.

How deep should gravel be for a driveway?

A new gravel driveway needs 8 to 12 inches in total, laid in compacted layers of larger base stone topped with smaller stone. Topping up an existing driveway usually takes 2 to 3 inches.

How many bags of gravel equal a cubic yard?

A cubic yard is 27 cubic feet, so it takes 54 bags of 0.5 cubic feet or 36 bags of 0.75 cubic feet.