This curb and gutter concrete calculator estimates the yardage for a curb, gutter, or barrier pour. Enter the cross-section area and the run length above to get the volume in cubic yards.

How to use this calculator

  1. Find the cross-section area of your curb profile in square feet.
  2. Enter the total run length in feet.
  3. Read the required cubic yards.

How is the yardage calculated?

Volume (ft³) = Cross-section area (ft²) × Length (ft)
Cubic yards  = Volume (ft³) ÷ 27

The cross-section area is the shape of the curb and gutter when you slice through it — add the curb rectangle and the gutter pan together.

Example calculation

For a profile of 1.5 ft² over a 100 ft run:

  • Volume = 1.5 × 100 = 150 ft³
  • Cubic yards = 150 ÷ 27 = 5.56 yd³
  • Add 10% → order about 6.1 yd³

Related calculators

Frequently Asked Questions

How do I calculate curb and gutter concrete?

Multiply the curb’s cross-section area in square feet by its length in feet, then divide by 27 to get cubic yards.

What is a typical curb and gutter cross-section?

A standard 6-inch barrier curb with an 18–24 inch gutter pan is often around 1.3–1.6 square feet in cross-section; use your own profile for accuracy.

Should I add waste for curb pours?

Yes, add about 10 percent for subgrade variation and forms, and round up to the nearest quarter yard.